Dewberry has completed planning and funding assistance, design, and construction services for dozens of wastewater treatment plants as large as 16-million-gallons-per-day (MGD). Many of these facilities have included innovative processes such as nitrification with submerged media, fine bubble aeration, sequence batch reactors, selectors, and other biological nutrient removal processes.

lines_dots

Click on image to see a larger view

Cayuga_Farms130px.jpg

Cayuga Farms Sewage Pumping Station and Force Main
Anne Arundel County, Maryland

Dewberry provided evaluation, design and construction phase services for a 2.86-MGD capacity, built-in-place sewage pumping station that included two VFD pumps with provisions for a third pump; hoist and trolley for pump/equipment removal, comminutor and bypass; complete bubbler-actuated level control system; and "Profibus" control system. The project also included an emergency generator and odor control measures, as well as over 15,000 linear feet of 16-inch HOPE force main.

lines_dots

BaltimoreOutfall

Outfall Collection System Evaluation and Sewershed Plan
Baltimore, Maryland

Dewberry and joint venture partner Brown & Caldwell are conducting an evaluation and preparing a sewershed plan for the Outfall Sewershed, which encompasses over 3.6 square miles, contains 2,206 manholes, and approximately 368,325 linear feet of gravity sewer. The Outfall Sewershed Plan consists of the following: sewer system inspection and characterization; public outreach; data management; Infiltration & Inflow (I&I) evaluations; long term capacity/peak flow management and hydraulic modeling; and sewershed plan.

lines_dots

Morris Farm Pumping Station

Morris Farm Pumping Station
Prince William County, Virginia

Dewberry team prepared preliminary engineering reports, plan and profile drawings, details, and specifications for construction. The pump station is equipped with submersible pumps, a Muffin Monster grinder, a flow meter, standby power generator set, surge relief valve, SCADA, soft start/soft stop. All engineering work was completed on schedule with no construction contract claims.
lines_dots

Adamstown Sewage Pump Stations

Adamstown Sewage Pump Stations #1 and #2
Adamstown, Maryland

Dewberry designed two precast sewer pumping stations (800,000 GPD and 1.0 MGD), precast control buildings, and approximately 10,000 LF of force main. This project was implemented on a fast-track basis. The pre-fabrication concept for two wet well, dry well stations saved Frederick County over $1.0 million in construction costs.
lines_dots

New Bristow Pumping Station

New Bristow Pumping Station
Prince William County, Virginia

Dewberry was responsible for the design and the construction administration for the 694 gpm wastewater pump station. It consists of an influent manhole, a 12-foot diameter comminutor vault, a 6-foot diameter wet well, valve vault, and meter vault. There is also a 14x14 foot control building. It has two submersible pumps; provisions have been made for a third pump when future development calls for more capacity.
lines_dots

Noman Cole Pollution Control Plant

Noman M. Cole, Jr. Pollution Control Plant Upgrade and Expansion
Fairfax County, VA

The engineering team of CH2M HILL and Dewberry worked on the $25 million expansion of the plant. Work included a new 100-MGD raw wastewater/equalization pumping station, a 16-million-gallon concrete equalization basin, site develop­ment, and several thousand feet of 36-inch, 42-inch, and 54-inch piping.
lines_dots

Henrico Water Reclamation Facility

Henrico Water Reclamation Facility
Henrico County, VA

The Team of Hazen and Sawyer, in association with Dewberry, provided preliminary engineering evaluations and design, construction administration, startup, O&M manual preparation, and operator training for the expansion of the Henrico County facility from 45- to 75-MGD capacity in a multi-phase project.
lines_dots

Petersburg Wastewater Treatment Plant

Petersburg Wastewater Treatment Plant
Petersburg, WV

Dewberry provided facility planning, sanitary sewer system evaluation study, design, construction administration, and resident construction inspection for the 1.35 MGD capacity Petersburg, WV wastewater plant. The recent expansion project included construction of an influent pumping station, a headworks with mechanical fine screen and vortex grit removal unit, a third oxidation ditch with integral clarifier, two additional aerobic digesters, an electrical service building, new enlarged aeration blower system, and an ultraviolet effluent disinfection facility.
lines_dots

Saugatuck Shores Sewer Extension

Saugatuck Shores Sewer Extension
Westport, CT

Dewberry handled the design and construction engineering services for the extension of sanitary sewers. Design services include survey, mapping, geotechnical, easements, and basic design services for an estimated 30,000 feet of low-pressure sewers, approximately 4,000 feet of gravity sewer system, a wastewater pumping station and 5,000 feet of force main.
lines_dots

Shirley Ave Pump Station 1322 Small

Shirley Avenue Pump Station
Franklin Township, NJ

Dewberry designed a 1.5 MGD sewage pumping station to service approximately 200 acres. The design of the pumping station included a dry-pit pumping chamber and separate wet well, both constructed from factory-built, concrete, modular sections with all appurtenant equipment.

lines_dots

Fairfax County Sewage Pump Station and Vault Rehabilitation
Fairfax County, VA
Dewberry conducted field inspections of sewer pump stations and vaults associated with various siphons in order to recommend improvements and to provide solutions to any problems. In addition, Dewberry performed evaluations of electrical and mechanical equipment; the extent of corrosion of metal materials, equipment, and interior concrete surfaces; and substitution of corrosive materials with metallic materials. Design of rehabilitation work at seven pump stations and 15 vaults, including drawings and specifications, cost estimates, services during bidding, services during construction, and operation phase services were provided. Several of the vaults with siphons are associated with crossings of the Potomac River.

lines_dots

Lake Manassas Wastewater Pumping Stations 1 and 2
Prince William County, VA
Dewberry prepared a preliminary engineering report and final plans and specifications for a sewer collection system, two pump stations, and a force main for Lake Manassas, a golf course community in western Prince William County, VA. Dewberry designed a gravity sanitary sewer collection system to Lake Manassas Pump Station No. 2 serving 370 single-family homes and 15 acres of commercial development. Lake Manassas Pump Station No. 1 includes two submersible pumps with a design capacity of 225 GPM. Sewage is pumped through 1,000 feet of 6-inch-diameter force main to a gravity sewer collection system to Lake Manassas Pump Station No. 2.

lines_dots

Upper Chickahominy Sewer Interceptor
Hanover, VA
Dewberry is assisting Hanover County by providing engineering plans and specifications for improvements to approximately 8,500 LF of sanitary sewer interceptor. As part of the work, a comprehensive capacity analysis incorporating projected future capacity requirements was conducted.

lines_dots

H-RRSA North River Wastewater Treatment Plant
Mount Crawford, VA
Dewberry provided multi-disciplinary professional engineering services including site, civil, surveying, process mechanical, architectural, structural, building services, electrical, I&C, and all permitting for the $14 million expansion of the existing North River WWTP from 8 MGD to 16 MGD. The project includes major revisions to the  raw sewage pumping station; new aeration basins and a major revision of the existing system converting it to fine bubble diffused air from mechanical aerators; new primary  clarifiers, a new tertiary filter and filter backwash pumping station, upgrades to the anaerobic digesters, installation of a septage receiving station, development and installation of a SCADA system for the plant and numerous other improvements.